File #: BL2022-1421    Name:
Type: Bill (Ordinance) Status: Passed
File created: 8/16/2022 In control: Transportation and Infrastructure Committee
On agenda: 10/4/2022 Final action: 10/4/2022
Title: An ordinance authorizing The Metropolitan Government of Nashville and Davidson County to accept new water and sanitary sewer mains, fire hydrant assemblies, sanitary sewer manholes and easements, for property located at Old Hickory Boulevard (unnumbered), also known as Evergreen Hills Phase 2B (MWS Project Nos. 21-WL-101 and 21-SL-236 and Proposal No. 2022M-099ES-001).
Sponsors: John Rutherford, Brett Withers, Russ Pulley
Attachments: 1. Exhibit
title
An ordinance authorizing The Metropolitan Government of Nashville and Davidson County to accept new water and sanitary sewer mains, fire hydrant assemblies, sanitary sewer manholes and easements, for property located at Old Hickory Boulevard (unnumbered), also known as Evergreen Hills Phase 2B (MWS Project Nos. 21-WL-101 and 21-SL-236 and Proposal No. 2022M-099ES-001).
body
WHEREAS, the acceptance of approximately 3,156 linear feet of new eight inch water main (DIP), approximately 2,275 linear feet of new eight inch sanitary sewer main (PVC), approximately 1,198 linear feet of new eight inch sanitary sewer main (DIP), six fire hydrant assemblies, 25 sanitary sewer manholes and easements, for property located at Old Hickory Boulevard (unnumbered), also known as Evergreen Hills Phase 2B, is needed to construct project numbers 21-WL-101 and 21-SL-236; and,
WHEREAS, the Metropolitan Planning Commission approved mandatory referral No. 2022M-099ES-001 on July 29, 2022, for the acceptance of said water and sanitary sewer mains, fire hydrant assemblies, sanitary sewer manholes and easements.
NOW, THEREFORE, BE IT ENACTED BY THE COUNCIL OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY:
Section 1. The Metropolitan Government of Nashville and Davidson County is authorized to accept approximately 3,156 linear feet of new eight inch water main (DIP), approximately 2,275 linear feet of new eight inch sanitary sewer main (PVC), approximately 1,198 linear feet of new eight sanitary sewer main (DIP), six fire hydrant assemblies, 25 sanitary sewer manholes and easements, for property located at Old Hickory Boulevard (unnumbered), also known as Evergreen Hills Phase 2B, as shown on Exhibit 1, which is attached hereto and incorporated by reference.
Map & Parcel: Address:
18200023100 Old Hickory Boulevard (unnumbered)
Section 2. The Directors of Water and Sewerage Services and Public Property Administration are authorized to execute such documents as may...

Click here for full text