File #: BL2024-300    Name:
Type: Bill (Ordinance) Status: Passed
File created: 3/7/2024 In control: Metropolitan Council
On agenda: 4/16/2024 Final action: 4/16/2024
Title: An ordinance authorizing The Metropolitan Government of Nashville and Davidson County to abandon existing public water and sanitary sewer mains, sanitary sewer manholes and easements, and to accept new public water and sanitary sewer mains, sanitary sewer manholes, relocation of fire hydrant assemblies, rehabilitation of existing sanitary sewer main, realignment of existing water main and sanitary sewer manholes and easements, for 13 properties located on Martin Street, Humphreys Street and Brown Street, also known as WeHo Phase 3 (MWS Project Nos. 22-WL-35 and 2-SL-77 and Proposal No. 2024M-014ES-001).
Sponsors: Terry Vo, Jennifer Gamble, Sean Parker
Attachments: 1. Exhibit
title
An ordinance authorizing The Metropolitan Government of Nashville and Davidson County to abandon existing public water and sanitary sewer mains, sanitary sewer manholes and easements, and to accept new public water and sanitary sewer mains, sanitary sewer manholes, relocation of fire hydrant assemblies, rehabilitation of existing sanitary sewer main, realignment of existing water main and sanitary sewer manholes and easements, for 13 properties located on Martin Street, Humphreys Street and Brown Street, also known as WeHo Phase 3 (MWS Project Nos. 22-WL-35 and 2-SL-77 and Proposal No. 2024M-014ES-001).
body
WHEREAS, the abandonment of approximately 414 linear feet of existing six-inch water main (DIP), approximately 165 linear feet of existing eight-inch sanitary sewer main (unknown material type), approximately 213 linear feet of existing eight-inch sanitary sewer main (concrete), approximately 214 linear feet of existing 18-inch sanitary sewer main (VCP), two sanitary sewer manholes and easements, and the acceptance of approximately 426 linear feet of new eight-inch water main (DIP), approximately 1,001 linear feet of new eight-inch sanitary sewer main (PVC), approximately 95 linear feet of new eight-inch sanitary sewer main (DIP), approximately 144 linear feet of new 18-inch sanitary sewer main (PVC), approximately 37 linear feet of new 18-inch sanitary sewer main (DIP), 15 sanitary sewer manholes, relocation of four fire hydrant assemblies, rehabilitation of approximately 234 linear feet of existing 18-inch sanitary sewer main (CIPP structural lining) (VCP), vertical realignment of approximately 47 linear feet of existing six inch water main (DIP), vertical realignment of approximately 29 linear feet to an existing 12-inch water main (DIP) and vertical adjustment of an existing sanitary sewer manhole and easements, for 13 properties located on Martin Street, Humphreys Street and Brown Street, also known as WeHo Phase 3, are needed to construct project...

Click here for full text