File #: RS2024-187    Name:
Type: Resolution Status: Passed
File created: 1/4/2024 In control: Metropolitan Council
On agenda: 1/16/2024 Final action: 1/23/2024
Title: A resolution approving a participation agreement between the Metropolitan Government of Nashville and Davidson County, acting by and through the Metropolitan Department of Water and Sewerage Services, and HCD Wedgewood 429 Houston LLC, to provide improved public sanitary sewer service through the construction of an improved stormwater system (Project No. 2022066576 and Proposal Number 2023M-045AG-001).
Sponsors: Terry Vo, Delishia Porterfield, Jennifer Gamble, Sean Parker
Attachments: 1. Participation Agreement Exhibit
title
A resolution approving a participation agreement between the Metropolitan Government of Nashville and Davidson County, acting by and through the Metropolitan Department of Water and Sewerage Services, and HCD Wedgewood 429 Houston LLC, to provide improved public sanitary sewer service through the construction of an improved stormwater system (Project No. 2022066576 and Proposal Number 2023M-045AG-001).
body
WHEREAS, the Metropolitan Department of Water and Sewerage Services ("METRO") owns and operates a combined sewer system located in the Driftwood basin with combined flow directed to the Central Wastewater Treatment Plant and a combined sewer outfall during heavy rain conditions; and,
WHEREAS, METRO desires to separate the stormwater and sewer flow in the Driftwood basin, thereby directing stormwater flow to the Cumberland River and the sewage flow to the Central Waste Water Treatment Plant; and,
WHEREAS, by separating the stormwater and sewage, METRO has an opportunity to reduce the overall volume load in the Driftwood basin combined sewer resulting in a reduction in the potential for localized storm flooding, surcharging sewer, and odor. Furthermore, separating the stormwater and sewage will improve overall water quality in the Cumberland River; and,
WHEREAS, HCD Wedgewood 429 Houston LLC ("DEVELOPER") has been approved to redevelop an existing commercial facility on a 1.1 acre site located in the Combined Sewer System for the Driftwood Basin; and,
WHEREAS, METRO is developing the design and construction of dedicated storm infrastructure consistent with the Combined Sewer Master Plan; and,
WHEREAS, DEVELOPER agrees to provide on-site stormwater control measures and to provide METRO the amount of $173,717.16 to fund the design and construction of the current and new stormwater infrastructure, according to the terms of the Combined Sewer Project Participation Agreement - 429 Houston Street, attached as Exhibit 1; and,
WHEREAS, METRO agrees to begin ...

Click here for full text