File #: RS2023-2306    Name:
Type: Resolution Status: Passed
File created: 6/22/2023 In control: Metropolitan Council
On agenda: 7/6/2023 Final action: 7/6/2023
Title: A resolution to amend Ordinance No. BL2021-1020 to authorize The Metropolitan Government of Nashville and Davidson County to modify the abandonment and acceptance of public water mains, fire hydrant assemblies and easements, for property located at 1201 Hillside Avenue, also known as Reservoir- Zone 4A (MWS Project Nos. 21-WL-71 and 21-SL-160 and Proposal Nos. 2021M-082ES-001 and 2023M-064ES-001).
Sponsors: Colby Sledge, Brett Withers, Russ Pulley
Attachments: 1. Exhibit
title
A resolution to amend Ordinance No. BL2021-1020 to authorize The Metropolitan Government of Nashville and Davidson County to modify the abandonment and acceptance of public water mains, fire hydrant assemblies and easements, for property located at 1201 Hillside Avenue, also known as Reservoir- Zone 4A (MWS Project Nos. 21-WL-71 and 21-SL-160 and Proposal Nos. 2021M-082ES-001 and 2023M-064ES-001).
body
WHEREAS, Ordinance No. BL2021-1020, approved December 22, 2021, authorized the abandonment of approximately 637 linear feet of existing eight inch sanitary sewer main, approximately 394 linear feet of existing six inch water main, approximately 396 linear feet of existing 30 inch water main, eight sanitary sewer manholes, one fire hydrant assembly and easements, and the acceptance of approximately 311 linear feet of new eight inch sanitary sewer main (DIP), approximately 482 linear feet of new six inch water main (DIP), approximately 481 linear feet of new 30 inch water main (DIP), five sanitary sewer manholes, two fire hydrant assemblies and easements, for property located at 1201 Hillside Avenue, also known as the Reservoir- Zone 4A; and,
WHEREAS, the abandonment of an additional approximately 229 linear feet of existing 30-inch water main, an additional approximately 150 linear feet of existing six-inch water main and easements, and the acceptance of an additional approximately 88 linear feet of new 30-inch water main (DIP), approximately 567 linear feet of new eight-inch water main (DIP) and easements, are needed to construct Project Nos. 21-WL-71 and 21-SL-160; and,
WHEREAS, the previously approved acceptance of approximately 482 linear feet of new six inch water main (DIP), is no longer needed to construct Project No. 21-WL-71; and,
WHEREAS, the previously approved acceptance of two fire hydrant assemblies is now the acceptance of one fire hydrant assembly and the relocation of two fire hydrant assemblies; needed to construct Project No. 21-WL-71; and,...

Click here for full text