File #: BL2022-1180    Name:
Type: Bill (Ordinance) Status: Passed
File created: 3/23/2022 In control: Metropolitan Council
On agenda: 5/5/2022 Final action: 5/5/2022
Title: An ordinance authorizing The Metropolitan Government of Nashville and Davidson County to abandon existing fire hydrant assembly and to accept new water and sanitary sewer mains, fire hydrant assemblies, sanitary sewer manholes and easements, for property located 3517 Brick Church Pike, also known as Mulberry Downs Phase 5 (MWS Project Nos. 20-WL-111 and 20-SL-217 and Proposal No. 2022M-033ES-001).
Sponsors: Jennifer Gamble, Brett Withers, Zach Young
Attachments: 1. Exhibits
title
An ordinance authorizing The Metropolitan Government of Nashville and Davidson County to abandon existing fire hydrant assembly and to accept new water and sanitary sewer mains, fire hydrant assemblies, sanitary sewer manholes and easements, for property located 3517 Brick Church Pike, also known as Mulberry Downs Phase 5 (MWS Project Nos. 20-WL-111 and 20-SL-217 and Proposal No. 2022M-033ES-001).
body
WHEREAS, the abandonment of one fire hydrant assembly, and the acceptance of approximately 1,243 linear feet of eight inch water main (DIP), approximately eight linear feet of six inch water main (DIP), approximately 1,268 linear feet of eight inch sanitary sewer main (PVC), four fire hydrant assemblies, seven sanitary sewer manholes and easements, for property located 3517 Brick Church Pike, are needed to construct project numbers 20-WL-111 and 20-SL-217; and,
WHEREAS, the Metropolitan Planning Commission approved mandatory referral No. 2022M-033ES-001 on March 8, 2022, for the abandonment and acceptance of said water and sanitary sewer mains, fire hydrant assemblies, sanitary sewer manholes and easements.
NOW, THEREFORE, BE IT ENACTED BY THE COUNCIL OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY:
Section 1. The Metropolitan Government of Nashville and Davidson County is authorized to abandon one fire hydrant assembly' and to accept approximately 1,243 linear feet of eight inch water main (DIP), approximately eight linear feet of six inch water main (DIP), approximately 1,268 linear feet of eight inch sanitary sewer main (PVC), four fire hydrant assemblies, seven sanitary sewer manholes and easements, for property located 3517 Brick Church Pike, also known as Mulberry Downs Phase 5, as shown on Exhibit 1, which is attached hereto and incorporated by reference.
Map & Parcel: Address:
05000002900 3517 Brick Church Pike
Section 2. The Directors of Water and Sewerage Services and Public Property Administration are authorized to execute su...

Click here for full text