File #: BL2020-588    Name:
Type: Bill (Ordinance) Status: Passed
File created: 12/3/2020 In control: Metropolitan Council
On agenda: 1/19/2021 Final action: 1/19/2021
Title: An ordinance authorizing The Metropolitan Government of Nashville and Davidson County to abandon existing water and sanitary sewer mains, sanitary sewer manholes and easements, to replace one fire hydrant assembly, and to accept new water and sanitary sewer mains, sanitary sewer manholes and easements, for eight properties located on South 5th Street, South 6th Street, Davidson Street, and Crutcher Street, also known as the Cayce Utility Phase 1A Development (MWS Project Nos. 20-WL-50 and 20-SL-94 and Proposal No. 2020M-100ES-001).
Sponsors: Brett Withers, Kathleen Murphy, Bob Nash
Attachments: 1. BL2020-588 Exhibit 1, 2. BL2020-588 Exhibit 2
title
An ordinance authorizing The Metropolitan Government of Nashville and Davidson County to abandon existing water and sanitary sewer mains, sanitary sewer manholes and easements, to replace one fire hydrant assembly, and to accept new water and sanitary sewer mains, sanitary sewer manholes and easements, for eight properties located on South 5th Street, South 6th Street, Davidson Street, and Crutcher Street, also known as the Cayce Utility Phase 1A Development (MWS Project Nos. 20-WL-50 and 20-SL-94 and Proposal No. 2020M-100ES-001).
body
WHEREAS, the abandonment of approximately 53 linear feet of existing six inch water main, approximately 1,050 linear feet of existing 12 inch water main, approximately 500 linear feet of eight inch sanitary sewer main, four sanitary sewer manholes and easements, the replacement of one fire hydrant assembly, and the acceptance of approximately 85 linear feet of new eight inch water main (DIP), approximately 1,000 linear feet of new 12 inch water main (DIP), approximately 102 linear feet of new eight inch sanitary sewer main (DIP), approximately 164 linear feet of new 10 inch sanitary sewer main (DIP), approximately 241 linear feet of new 10 inch sanitary sewer main (PVC), nine sanitary sewer manholes and easements, for eight properties located on South 5th Street, South 6th Street, Davidson Street and Crutcher Street, also known as Cayce Utility Phase 1A, is needed to construct MWS Project Nos. 20-WL-50 and 20-SL-94 and Proposal No. 2020M-100ES-001.
WHEREAS, the Metropolitan Planning Commission approved mandatory referral No. 2020M-100ES-001 on November 19, 2020, for the abandonment, replacement and acceptance of said water and sanitary sewer mains, fire hydrant assembly, sanitary sewer manholes, and easements.
NOW, THEREFORE, BE IT ENACTED BY THE COUNCIL OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY:
Section 1. The Metropolitan Government of Nashville and Davidson County is authorized to abandon approximat...

Click here for full text