File #: BL2021-865   
Type: Bill (Ordinance) Status: Passed
File created: 8/5/2021 In control: Metropolitan Council
On agenda: 9/21/2021 Final action: 9/21/2021
Title: An ordinance authorizing The Metropolitan Government of Nashville and Davidson County to abandon an existing public water main and easements, and to accept new water and sanitary sewer mains, fire hydrant assemblies, sanitary sewer manholes and easements, for property located at 3517 Brick Church Pike, also known as Mulberry Downs Phase 2 (MWS Project No. 21-WL-108 and 21-SL-214; and Proposal No. 2021M-058ES-001).
Sponsors: Jennifer Gamble, Kathleen Murphy, Bob Nash
Attachments: 1. BL2021-865 Attachments
title
An ordinance authorizing The Metropolitan Government of Nashville and Davidson County to abandon an existing public water main and easements, and to accept new water and sanitary sewer mains, fire hydrant assemblies, sanitary sewer manholes and easements, for property located at 3517 Brick Church Pike, also known as Mulberry Downs Phase 2 (MWS Project No. 21-WL-108 and 21-SL-214; and Proposal No. 2021M-058ES-001).
body
WHEREAS, the abandonment of approximately 611 linear feet of existing eight inch water main (DIP) and easements, and the acceptance of approximately 3,732 linear feet of new eight inch water main (DIP), approximately 2,145 linear feet of new eight inch sanitary sewer main (PVC), approximately 506 linear feet of new eight inch sanitary sewer main (DIP), four fire hydrant assemblies, 18 sanitary sewer manholes and easements, for property located at 3517 Brick Church Pike, also known as Mulberry Downs Phase 2, are needed to construct project numbers 21-WL-108 and 21-SL-214; and,
WHEREAS, the Metropolitan Planning Commission approved mandatory referral No. 2021M-058ES-001 on July 13, 2021, for the abandonment and acceptance of said water and sanitary sewer mains, fire hydrant assemblies, sanitary sewer manholes and easements.
NOW, THEREFORE, BE IT ENACTED BY THE COUNCIL OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY:
Section 1. The Metropolitan Government of Nashville and Davidson County is authorized to abandon approximately 611 linear feet of existing eight inch water main (DIP) and easements, and to accept approximately 3,732 linear feet of new eight inch water main (DIP), approximately 2,145 linear feet of new eight inch sanitary sewer main (PVC), approximately 506 linear feet of new eight inch sanitary sewer main (DIP), four fire hydrant assemblies, 18 sanitary sewer manholes and easements, for property located at 3517 Brick Church Pike, also known as Mulberry Downs Phase 2, as shown on Exhibit 1, which is attached hereto a...

Click here for full text