title
An ordinance authorizing The Metropolitan Government of Nashville and Davidson County to abandon existing public water and sanitary sewer mains, fire hydrant assemblies, sanitary sewer manhole and easements, and to accept new public water and sanitary sewer mains, fire hydrant assemblies, sanitary sewer manholes and easements, for property located at 1520 Hampton Street, also known as 1520 Hampton Street SP, (MWS Project Nos. 24-WL-13 and 24-SL-26 and Proposal No. 2025M-086ES-001).
body
WHEREAS, the abandonment of approximately 71 linear feet of existing six-inch water main (DIP), approximately 280 linear feet of existing eight-inch sanitary sewer main (VCP), two fire hydrant assemblies, one sanitary sewer manhole and easements, and the acceptance of approximately 652 linear feet of new six-inch water main (DIP), approximately 702 linear feet of new eight-inch sanitary sewer main (PVC), two fire hydrant assemblies, 10 sanitary sewer manholes and easements, for property located at 1520 Hampton Street, also known as 1520 Hampton Street SP, are needed to construct project numbers 24-WL-13 and 24-SL-26; and,
WHEREAS, the Metropolitan Planning Commission approved mandatory referral No. 2025M-086ES-001 on June 26, 2025, for the abandonment and acceptance of said water and sanitary sewer mains, fire hydrant assemblies, sanitary sewer manholes and easements.
NOW, THEREFORE, BE IT ENACTED BY THE COUNCIL OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY:
Section 1. The Metropolitan Government of Nashville and Davidson County is authorized to abandon approximately 71 linear feet of existing six-inch water main (DIP), approximately 280 linear feet of existing eight-inch sanitary sewer main (VCP), two fire hydrant assemblies, one sanitary sewer manhole and easements, and to accept approximately 652 linear feet of new six-inch water main (DIP), approximately 702 linear feet of new eight-inch sanitary sewer main (PVC), two fire hydrant assemblies, 10 sanita...
Click here for full text