title
An ordinance authorizing The Metropolitan Government of Nashville and Davidson County to accept new water and sanitary sewer mains, fire hydrant assembly, sanitary sewer manholes and easements, for property located at 524 Edwin Street and Edwin Street (unnumbered), also known as Edwin Greens Phase 2 (MWS Project Nos. 23-WL-34 and 23-SL-74 and Proposal No. 2023M-163ES-001).
body
WHEREAS, the acceptance of approximately 25 linear feet of new six-inch water main (DIP), approximately 159 linear feet of new eight-inch sewer main (DIP), one fire hydrant assembly, two sanitary sewer manholes and easements, for property located at 524 Edwin Street and Edwin Street (unnumbered), also known as Edwin Greens Phase 2, is needed to construct project numbers 23-WL-34 and 23-SL-74; and,
WHEREAS, the Metropolitan Planning Commission approved mandatory referral No. 2023M-163ES-001 on October 19, 2023, for the acceptance of said water and sanitary sewer mains, fire hydrant assembly, sanitary sewer manholes and easements.
NOW, THEREFORE, BE IT ENACTED BY THE COUNCIL OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY:
Section 1. The Metropolitan Government of Nashville and Davidson County is authorized to accept approximately 25 linear feet of new six-inch water main (DIP), approximately 159 linear feet of new eight-inch sewer main (DIP), one fire hydrant assembly, two sanitary sewer manholes and easements, for property located at 524 Edwin Street and Edwin Street (unnumbered), also known as Edwin Greens Phase 2, as shown on Exhibit 1, which is attached hereto and incorporated by reference.
Map & Parcel: Address:
071084A90000CO Edwin Street (unnumbered)
07108037300 524 Edwin Street
Section 2. The Directors of Water and Sewerage Services and Public Property Administration are authorized to execute such documents as may be necessary and appropriate to carry out the acceptance authorized by this ordinance.
Section 3. Amendments to this legislation shall b...