Title: A resolution to amend Ordinance No. BL2025-973 to authorize The Metropolitan Government of Nashville and Davidson County to add the abandonment of existing public water main and sanitary sewer manholes, to modify the acceptance of water and sanitary sewer mains, fire hydrant assemblies, sanitary sewer manholes and easements, to update Map and Parcel information and to add phasing, for property now located at 117 B Straton Lane, also now known as Walton Station Phase 1 (MWS Project Nos. 23-WL-100 and 23-SL-271 and Proposal No. 2025M091ES002).
Sponsors: Sean Parker, Rollin Horton, Quin Evans-Segall
Attachments: 1. Exhibit 1, 2. PC Approval Letter
title
A resolution to amend Ordinance No. BL2025-973 to authorize The Metropolitan Government of Nashville and Davidson County to add the abandonment of existing public water main and sanitary sewer manholes, to modify the acceptance of water and sanitary sewer mains, fire hydrant assemblies, sanitary sewer manholes and easements, to update Map and Parcel information and to add phasing, for property now located at 117 B Straton Lane, also now known as Walton Station Phase 1 (MWS Project Nos. 23-WL-100 and 23-SL-271 and Proposal No. 2025M091ES002).
body
WHEREAS, Ordinance No. BL2025-973, approved, September 2, 2025, authorized the abandonment of approximately 500 linear feet of existing eight-inch sanitary sewer main (VCP), one fire hydrant assembly and easements, and the acceptance of approximately 4,053 linear feet of new eight-inch water main (DIP), approximately 1,239 linear feet of new eight-inch sanitary sewer main (DIP), approximately 3,317 linear feet of new eight inch sanitary sewer main (PVC), eight fire hydrant assemblies, 30 sanitary sewer manholes and easements, for six properties located on Walton Lane, also known as Walton Station; and,
WHEREAS, the abandonment of approximately 90 linear feet of existing eight-inch water main (DIP) and two sanitary sewer manholes, and the acceptance of approximately 3,553 fewer linear feet of new eight-inch water main (DIP), approximately 3,040 fewer linear feet of new eight-inch sanitary sewer main (PVC), approximately 367 fewer linear feet of new eight-inch sanitary sewer main (DIP), six fewer fire hydrant assemblies, 18 fewer sanitary sewer manholes and easements, are now needed to construct Project Nos. 23-WL-100 and 23-SL-271; and,
WHEREAS, the Map and Parcel information of the previously approved property has been consolidated to property located at 117 B Straton Lane and phasing has been added; and,
WHEREAS, the Metropolitan Planning Commission approved mandatory referral No. 2025M091ES-002 on July 28, 2026,...

Click here for full text