An ordinance authorizing The Metropolitan Government of Nashville and Davidson County to abandon existing public water main, fire hydrant assembles and easements, and to accept new public water and sanitary sewer mains, fire hydrant assemblies, sanitary sewer manholes and easements, for property located at 201 Shelby Avenue, also known as the New Nissan Stadium (MWS Project Nos. 24-WL-08 and 24-SL-13 and Proposal No. 2024M-114ES-001).
body
WHEREAS, the abandonment of approximately 1,753 linear feet of existing six-inch water main (DIP), three fire hydrant assemblies and easements, and the acceptance of approximately 4,826 linear feet of new 12-inch water main (DIP), approximately 856 linear feet of new 15-inch sanitary sewer main (PVC), approximately 663 linear feet of new 18-inch sanitary sewer main (PVC), approximately 53 linear feet of new 24-inch sanitary sewer main (DIP), 10 fire hydrant assemblies, 15 sanitary sewer manholes and easements, for property located at 201 Shelby Avenue, also known as the New Nissan Stadium, are needed to construct project numbers 24-WL-08 and 24-SL-13; and,
WHEREAS, the Metropolitan Planning Commission approved mandatory referral No. 2024M-114ES-001 on September 20, 2024, for the abandonment and acceptance of said water and sanitary sewer mains, fire hydrant assemblies, sanitary sewer manholes and easements.
NOW, THEREFORE, BE IT ENACTED BY THE COUNCIL OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY:
Section 1. The Metropolitan Government of Nashville and Davidson County is authorized to abandon approximately 1,753 linear feet of existing six-inch water main (DIP), three fire hydrant assemblies and easements, and to accept approximately 4,826 linear feet of new 12-inch water main (DIP), approximately 856 linear feet of new 15-inch sanitary sewer main (PVC), approximately 663 linear feet of new 18-inch sanitary sewer main (PVC), approximately 53 linear feet of new 24-inch sanitary sewer main (DIP), 10 fire ...