File #: BL2020-561   
Type: Bill (Ordinance) Status: Passed
File created: 11/18/2020 In control: Metropolitan Council
On agenda: 1/5/2021 Final action: 1/5/2021
Title: An ordinance authorizing The Metropolitan Government of Nashville and Davidson County to accept new public water and sanitary sewer mains, fire hydrant assemblies, sanitary sewer manholes and easements, for property located at Maxwell Road (unnumbered), also known as Oliveri Phase 3 (MWS Project Nos. 20-WL-77 and 20-SL-143 and Proposal No. 2020M-096ES-001).
Sponsors: Kathleen Murphy, Bob Nash, Antoinette Lee
Attachments: 1. BL2020-561 Exhibit 1
title
An ordinance authorizing The Metropolitan Government of Nashville and Davidson County to accept new public water and sanitary sewer mains, fire hydrant assemblies, sanitary sewer manholes and easements, for property located at Maxwell Road (unnumbered), also known as Oliveri Phase 3 (MWS Project Nos. 20-WL-77 and 20-SL-143 and Proposal No. 2020M-096ES-001).
body
WHEREAS, the acceptance of approximately 1,670 linear feet of new eight inch water main (DIP), approximately 2,266 linear feet of new eight inch sanitary sewer main (PVC), approximately 400 linear feet of new eight inch sanitary sewer main (DIP), three fire hydrant assemblies, 16 sanitary sewer manholes and easements, for property located on Maxell Road (unnumbered), also known as Oliveri Phase 3, is needed to construct project numbers 20-WL-77 and 20-SL-143; and,
WHEREAS, the Metropolitan Planning Commission approved mandatory referral No. 2020M-096ES-001 on November 6, 2020, for the acceptance of said water and sanitary sewer mains, fire hydrant assemblies, sanitary sewer manholes and easements.
NOW, THEREFORE, BE IT ENACTED BY THE COUNCIL OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY:
Section 1. The Metropolitan Government of Nashville and Davidson County is authorized to accept approximately 1,670 linear feet of new eight inch water main (DIP), approximately 2,266 linear feet of new eight inch sanitary sewer main (PVC), approximately 400 linear feet of new eight inch sanitary sewer main (DIP), three fire hydrant assemblies, 16 sanitary sewer manholes and easements, for property located on Maxell Road (unnumbered), also known as Oliveri Phase 3, as shown on Exhibit 1, which is attached hereto and incorporated by reference.
Map & Parcel: Address:
17500010200 Maxwell Road (unnumbered)
Section 2. The Directors of Water and Sewerage Services and Public Property Administration are authorized to execute such documents as may be necessary and appropriate to carry out the accep...