title
An ordinance authorizing The Metropolitan Government of Nashville and Davidson County to accept new water and sanitary sewer mains, fire hydrant assembly, sanitary sewer manholes and easements and to relocate a fire hydrant assembly, for property located 115 Hart Lane, (MWS Project Nos. 21-WL-106 and 21-SL-260 and Proposal No. 2022M-074ES-001).
body
WHEREAS, the acceptance of approximately 644 linear feet of new eight inch water main (DIP), approximately 617 linear feet of new eight inch sanitary sewer main (PVC), one fire hydrant assembly, eight sanitary sewer manholes and easements and the relocation of one existing fire hydrant assembly, for property located at 115 Hart Lane, is needed to construct project numbers 21-WL-106 and 21-SL-260; and,
WHEREAS, the Metropolitan Planning Commission approved mandatory referral No. 2022M-074ES-001 on May 9, 2022, for the acceptance and relocation of said water and sanitary sewer mains, fire hydrant assemblies, sanitary sewer manholes and easements.
NOW, THEREFORE, BE IT ENACTED BY THE COUNCIL OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY:
Section 1. The Metropolitan Government of Nashville and Davidson County is authorized to accept approximately 644 linear feet of new eight inch water main (DIP), approximately 617 linear feet of new eight inch sanitary sewer main (PVC), one fire hydrant assembly, eight sanitary sewer manholes and easements and to relocate one existing fire hydrant assembly, for property located at 115 Hart Lane, as shown on Exhibit 1, which is attached hereto and incorporated by reference.
Map & Parcel: Address:
06012005700 115 Hart Lane
Section 2. The Directors of Water and Sewerage Services and Public Property Administration are authorized to execute such documents as may be necessary and appropriate to carry out the acceptance and relocation authorized by this ordinance.
Section 3. Amendments to this legislation shall be approved by resolution.
Section 4. This ordinan...
Click here for full text