title
An ordinance authorizing The Metropolitan Government of Nashville and Davidson County to accept new public water and sanitary sewer mains, a fire hydrant assembly, sanitary sewer manholes and easements, for property located at Maxwell Road (unnumbered), also known as Oliveri Phase 2 (MWS Project Nos. 20-WL-76 and 20-SL-142 and Proposal No. 2020M-097ES-001).
body
WHEREAS, the acceptance of approximately 580 linear feet of new eight inch water main (DIP), approximately 386 linear feet of new six inch water main (DIP), approximately 565 linear feet of new eight inch sanitary sewer main (PVC), one fire hydrant assembly, four sanitary sewer manholes and easements, for property located at Maxwell Road (unnumbered), also known as Oliveri Phase 2, is needed to construct project numbers 20-WL-76 and 20-SL-142; and,
WHEREAS, the Metropolitan Planning Commission approved mandatory referral No. 2020M-097ES-001 on November 6, 2020, for the acceptance of said water and sanitary sewer mains, fire hydrant assembly, sanitary sewer manholes and easements.
NOW, THEREFORE, BE IT ENACTED BY THE COUNCIL OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY:
Section 1. The Metropolitan Government of Nashville and Davidson County is authorized to accept approximately 580 linear feet of new eight inch water main (DIP), approximately 386 linear feet of new six inch water main (DIP), approximately 565 linear feet of new eight inch sanitary sewer main (PVC), one fire hydrant assembly, four sanitary sewer manholes and easements, for property located at Maxwell Road (unnumbered), also known as Oliveri Phase 2, as shown on Exhibit 1, which is attached hereto and incorporated by reference.
Map & Parcel: Address:
17500010200 Maxwell Road (unnumbered)
Section 2. The Directors of Water and Sewerage Services and Public Property Administration are authorized to execute such documents as may be necessary and appropriate to carry out the acceptance authorized by this ordinance.
Section 3. Amendments to this legislation shall be approved by resolution.
Section 4. This ordinance shall take effect from and after its final passage, the welfare of The Metropolitan Government of Nashville and Davidson County requiring it.
Agenda Analysis
Analysis
This ordinance accepts 580 linear feet of new eight inch water main, 386 linear feet of new six inch water main, 565 linear feet of new eight inch sanitary sewer main, one fire hydrant assembly, four sanitary sewer manholes, and easements, for property located at Maxwell Road (unnumbered), also known as Oliveri Phase 2. This ordinance has been approved by the planning commission. Future amendments to this legislation may be approved by resolution.
Fiscal Note: This ordinance has no cost to Metro. Donated easements have no market value according to the Department of Metro Water Services.