An ordinance authorizing The Metropolitan Government of Nashville and Davidson County to abandon existing public water and sanitary sewer mains, fire hydrant assemblies, sanitary sewer manholes and easements, and to accept new water and sanitary sewer mains, fire hydrant assemblies, sanitary sewer manholes and easements, for property located between Fogg Street and Allison Street on 7th Avenue South, also known as Paseo South Gulch Phase 2 at 700 8th Avenue South (MWS Project No. 24-WL-19 and 24-SL-41 and Proposal No. 2025M-071ES-002).
body
WHEREAS, the abandonment of approximately 206 linear feet of existing six-inch water main, approximately 1,120 linear feet of existing eight-inch sanitary sewer main, two fire hydrant assemblies, five sanitary sewer manholes and associated easements, and the acceptance of approximately 201 linear feet of new eight-inch water main (DIP), approximately 116 linear feet of new eight-inch sanitary sewer main (PVC), approximately 1,181 linear feet of new eight-inch sanitary sewer main (PVC), two fire hydrant assemblies, 10 sanitary sewer manholes and associated easements, for the property located between Fogg Street and Allison Street on 7th Avenue South, also known as Paseo South Gulch Phase 2 at 700 8th Avenue South, are needed to construct project number 24-WL-19 and 24-SL-45; and,
WHEREAS, the Metropolitan Planning Commission approved mandatory referral No. 2025M-071ES-002 on June 25, 2025, for the abandonment and acceptance of said water and sanitary sewer mains, fire hydrant assemblies, sanitary sewer manholes and easements.
NOW, THEREFORE, BE IT ENACTED BY THE COUNCIL OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY:
Section 1. The Metropolitan Government of Nashville and Davidson County is authorized to abandon approximately 206 linear feet of existing six-inch water main, approximately 1,120 linear feet of existing eight-inch sanitary sewer main, two fire hydrant assemblies, five sanitary sewer manholes and associated easements, and to accept approximately 201 linear feet of new eight-inch water main (DIP), approximately 116 linear feet of new eight-inch sanitary sewer main (PVC), approximately 1,181 linear feet of new eight-inch sanitary sewer main (PVC), two fire hydrant assemblies, 10 sanitary sewer manholes and associated easements, for the property located between Fogg Street and Allison Street on 7th Avenue South, also known as Paseo South Gulch Phase 2 at 700 8th Avenue South, as shown on Exhibit 1, which is attached hereto and incorporated by reference.
Map & Parcel: Address:
093140B90000CO 700 8th Avenue South
Section 2. The Directors of Water and Sewerage Services and Public Property Administration are authorized to execute such documents as may be necessary and appropriate to carry out the abandonment and acceptance authorized by this ordinance.