File #: RS2025-1450   
Type: Resolution Status: Passed
File created: 8/7/2025 In control: Metropolitan Council
On agenda: 8/19/2025 Final action: 8/19/2025
Title: A resolution to amend Ordinance No. BL2025-859 to authorize The Metropolitan Government of Nashville and Davidson County to add the abandonment and acceptance of water mains, and modify the acceptance of water main and easements, for two properties located at 1300 and 1310 Donelson Pike, also known as Donelson Pike Industrial West, (MWS Project No. 23-WL-144 and Proposal No. 2025M-049ES-002).
Sponsors: Russ Bradford, Jennifer Gamble, Sean Parker
Attachments: 1. Exhibit 1, 2. PC Approval Letter

title

A resolution to amend Ordinance No. BL2025-859 to authorize The Metropolitan Government of Nashville and Davidson County to add the abandonment and acceptance of water mains, and modify the acceptance of water main and easements, for two properties located at 1300 and 1310 Donelson Pike, also known as Donelson Pike Industrial West, (MWS Project No. 23-WL-144 and Proposal No. 2025M-049ES-002).

body

WHEREAS, Ordinance No. BL2025-859, approved July 2, 2025, authorized the acceptance of approximately 1,757 linear feet of new eight-inch water main (DIP), two fire hydrant assemblies and easements, for two properties located at 1300 and 1310 Donelson Pike, also known as Donelson Pike Industrial West; and,

WHEREAS, the abandonment of approximately 60 linear feet of existing eight-inch water main (DIP), the acceptance of approximately 60 linear feet of new eight-inch water main, the acceptance of approximately 572 linear feet of new 10-inch water main (DIP) and easement, and the acceptance of approximately 572 linear feet less of new eight-inch water main (DIP) and easements, are now needed to construct Project No. 23-WL-144; and,

WHEREAS, the Metropolitan Planning Commission approved mandatory referral No. 2025M-049ES-002 on July 24, 2025, for revisions to the original mandatory referral; and,

WHEREAS, Ordinance No. BL2025-859 provides that amendments to the legislation shall be approved by resolution.

Now, therefore, be it resolved by the Council of The Metropolitan Government of Nashville and Davidson County:

Section 1.                     That Ordinance No. BL2025-859 is hereby amended by deleting Section 1 in its entirety and replacing it with the following:

The Metropolitan Government of Nashville and Davidson County is authorized to abandon approximately 60 linear feet of existing eight-inch water main (DIP), to accept approximately 60 linear feet of new eight-inch water main (DIP), and to accept approximately 1,185 linear feet of new eight-inch water main (DIP), approximately 572 linear feet of new 10-inch water main, two fire hydrant assemblies and easements, for two properties located at 1300 and 1310 Donelson Pike, also known as Donelson Pike Industrial West, as shown below and on Exhibit 1, which is attached hereto and incorporated by reference:

Map & Parcel:                                                                                                         Address:

13400033100                                                                                                         1300 Donelson Pike

13400033200                                                                                                         1310 Donelson Pike

Section 2.                     The Directors of Water and Sewerage Services and Public Property Administration are authorized to execute such documents as may be necessary and appropriate to carry out the abandonment and acceptance authorized by this resolution.

Section 3. This resolution shall take effect upon passage, the welfare of The Metropolitan Government of Nashville and Davidson County requiring it.

Agenda Analysis

Analysis

 

Ordinance No. BL2025-859 was approved by the Metropolitan Council on July 2, 2025. The ordinance authorized the acceptance of approximately 1,757 linear feet of new eight-inch water main (DIP), two fire hydrant assemblies and easements, for two properties located at 1300 and 1310 Donelson Pike, also known as Donelson Pike Industrial West. BL2025-859 provides that amendments to the ordinance may be approved by resolution.

 

The proposed resolution would amend BL2025-to abandon 60 linear feet of existing eight-inch water main (DIP) and accept approximately 60 linear feet of new eight-inch water main, approximately 572 linear feet of new 10-inch water main (DIP) and easement of approximately 572 fewer linear feet of new eight-inch water main (DIP) and easements.

 

These changes have been approved by the Planning Commission.